{"ok":true,"updated":"2026-11-23","totals":{"plants":12,"by_status":{"proposed":2,"permitted":5,"building":2,"running":3},"by_fuel":{"gas":9,"nuclear":3},"gas_mw_stated":13663,"gas_plants_with_size":8,"with_batteries":2,"note":"Capacity is added only for gas plants whose size a source states. Nuclear agreements are never added."},"plants":[{"slug":"colossus-1-turbines","name":"Colossus 1 gas turbines","url":"https://siscto.si/onsite-power/colossus-1-turbines/","serves":"xAI's Colossus 1 data center, Memphis, Tennessee","power_map_site":"https://siscto.si/power-map/colossus-1/","fuel":"gas","tech":"15 Solar SMT-130 gas turbines","mw":247,"mw_text":"up to 247 MW","status":"permitted","status_date":"2025-07-02","connection":"On site, behind the meter or beside the campus","filing":"Air permit from the Shelby County Health Department, issued July 2, 2025, for 15 turbines","city":"Memphis","state":"TN","sources":[{"publisher":"TechCrunch","title":"xAI gets permits for 15 natural gas generators at Memphis data center","url":"https://techcrunch.com/2025/07/03/xai-gets-permits-for-15-natural-gas-generators-at-memphis-data-center","date":"2025-07-03","read":"2026-11-23"}]},{"slug":"southaven-turbines","name":"Southaven gas turbines for Colossus 2","url":"https://siscto.si/onsite-power/southaven-turbines/","serves":"xAI's Colossus 2 data center in Memphis, Tennessee, across the state line","power_map_site":"https://siscto.si/power-map/colossus-2/","fuel":"gas","tech":"41 permanent gas turbines","mw":null,"mw_text":"not stated in the sources read (41 turbines)","status":"permitted","status_date":"2026-03-10","connection":"On site, behind the meter or beside the campus","filing":"Construction permit approved by the Mississippi Environmental Quality Permit Board on March 10, 2026, issued to xAI affiliate MZX Tech","city":"Southaven","state":"MS","sources":[{"publisher":"Mississippi Free Press","title":"Mississippi permit board grants xAI's request for 41 Southaven gas turbines to power Memphis data center","url":"https://www.mississippifreepress.org/mississippi-permit-board-grants-xais-request-for-41-southaven-gas-turbines-to-power-memphis-data-center/","date":"2026-03-10","read":"2026-11-23"}]},{"slug":"stargate-abilene-onsite","name":"Stargate Abilene onsite gas plant","url":"https://siscto.si/onsite-power/stargate-abilene-onsite/","serves":"The OpenAI Stargate campus built by Crusoe in Abilene, Texas","power_map_site":"https://siscto.si/power-map/openai-stargate-abilene/","fuel":"gas","tech":"10 gas turbines built; 41 more turbines and 18 generators proposed","mw":360,"mw_text":"360 MW","status":"running","status_date":"2026-07-09","connection":"On site, behind the meter or beside the campus","filing":"Minor state permits of 2024 (permits by rule and standard permits) for 10 turbines and 62 backup diesel generators; a major air permit application for the expansion","city":"Abilene","state":"TX","sources":[{"publisher":"The Texas Tribune and Floodlight","title":"Planned Texas data centers could emit more greenhouse gases than many countries","url":"https://www.texastribune.org/2026/07/09/texas-data-centers-ai-power-plants-pollution-state-permits/","date":"2026-07-09","read":"2026-11-23"}]},{"slug":"socrates","name":"Socrates North and South","url":"https://siscto.si/onsite-power/socrates/","serves":"A data center of Sidecat, LLC, an affiliate of Meta Platforms, in New Albany, Ohio","power_map_site":"https://siscto.si/power-map/meta-prometheus/","fuel":"gas","tech":"Gas turbines and engines, two 200 MW sites","mw":400,"mw_text":"400 MW (200 MW each)","status":"building","status_date":"2026-05-05","connection":"On site, behind the meter or beside the campus","filing":"Ohio Power Siting Board approval of Socrates South (case 25-0185-EL-BLN), announced June 9, 2025","city":"New Albany","state":"OH","sources":[{"publisher":"Ohio Power Siting Board","title":"OPSB approves construction of Licking County natural gas-fired power plant","url":"https://content.govdelivery.com/accounts/OHPUC/bulletins/3e43bed","date":"2025-06-09","read":"2026-11-23"},{"publisher":"Williams","title":"Socrates North and South fact sheet","url":"https://www.williams.com/wp-content/uploads/sites/8/2025/08/1355-Socrates-North-Fact-Sheet_v6.pdf","date":"2025-08-01","read":"2026-11-23"},{"publisher":"Williams","title":"Q1 earnings recap: data centers accelerate new growth paths for Williams","url":"https://www.williams.com/2026/05/05/q1-earnings-recap-data-centers-accelerate-new-growth-paths-for-williams/","date":"2026-05-05","read":"2026-11-23"}]},{"slug":"apollo","name":"Apollo Power Generation Facility","url":"https://siscto.si/onsite-power/apollo/","serves":"The data center campus of Liames, LLC, beside the plant in Wood County, Ohio","power_map_site":"https://siscto.si/power-map/meta-bowling-green/","fuel":"gas","tech":"Gas generation with about 120 MW of battery storage","mw":350,"mw_text":"350 MW, plus about 120 MW of batteries","status":"permitted","status_date":"2026-02-03","connection":"On site, behind the meter or beside the campus","filing":"Ohio Power Siting Board certificate, case 25-973-EL-BGN, announced February 3, 2026","city":"Middleton Township, Wood County","state":"OH","sources":[{"publisher":"Ohio Power Siting Board","title":"OPSB authorizes construction of Wood County power plant","url":"https://content.govdelivery.com/accounts/OHPUC/bulletins/4077fa5","date":"2026-02-03","read":"2026-11-23"}]},{"slug":"entergy-meta-hyperion","name":"Franklin Farms 1 and 2 and Waterford 5","url":"https://siscto.si/onsite-power/entergy-meta-hyperion/","serves":"A Meta data center in north Louisiana (the Power Map's Meta Hyperion)","power_map_site":"https://siscto.si/power-map/meta-hyperion/","fuel":"gas","tech":"Three combined cycle gas units built by the utility","mw":2262,"mw_text":"2,262 MW","status":"permitted","status_date":"2025-08-31","connection":"Utility plants on the grid, certified to serve one customer","filing":"Louisiana Public Service Commission order of August 2025 accepting a settlement and certifying the units","city":"Richland Parish and Killona","state":"LA","sources":[{"publisher":"Entergy","title":"Annual report for 2025 (SEC Form 10-K)","url":"https://www.sec.gov/Archives/edgar/data/65984/000006598426000174/etr-20251231.htm","date":"2026-02-19","read":"2026-11-23"}]},{"slug":"entergy-evest","name":"Richland Parish 1 to 4 and Pointe Coupee 1 to 3","url":"https://siscto.si/onsite-power/entergy-evest/","serves":"A second Meta data center in north Louisiana, to be developed by Evest LLC","power_map_site":null,"fuel":"gas","tech":"Seven combined cycle gas units and three battery systems","mw":5278,"mw_text":"5,278 MW of gas units","status":"proposed","status_date":"2026-11-02","connection":"Utility plants on the grid, certified to serve one customer","filing":"Entergy Louisiana application to the LPSC of March 2026; a settlement recommends certification; LPSC decision expected in December 2026","city":"Richland Parish and Pointe Coupee Parish","state":"LA","sources":[{"publisher":"Entergy","title":"Quarterly report for the quarter ended September 30, 2026 (SEC Form 10-Q)","url":"https://www.sec.gov/Archives/edgar/data/65984/000006598426000325/etr-20260930.htm","date":"2026-11-02","read":"2026-11-23"}]},{"slug":"homer-city","name":"Homer City Energy Campus","url":"https://siscto.si/onsite-power/homer-city/","serves":"A planned data center campus at the former Homer City coal plant, Indiana County, Pennsylvania","power_map_site":null,"fuel":"gas","tech":"Seven GE Vernova 7HA.02 gas turbines","mw":4400,"mw_text":"up to 4,400 MW","status":"permitted","status_date":"2025-11-18","connection":"On site, behind the meter or beside the campus","filing":"Pennsylvania DEP final Air Quality Plan Approval 32-00457A, November 18, 2025","city":"Homer City","state":"PA","sources":[{"publisher":"Pennsylvania DEP","title":"Homer City Generation Site Redevelopment","url":"https://pa.gov/agencies/dep/dep-regions/northwest-regional-office/homer-city-generation-redevelopment","date":"2026-11-12","read":"2026-11-23"},{"publisher":"Homer City Generation","title":"Homer City Generation Receives Air Quality Plan Approval from PA DEP","url":"https://www.businesswire.com/news/home/20251120696816/en","date":"2025-11-20","read":"2026-11-23"}]},{"slug":"meta-el-paso-gas","name":"Gas plant for Meta in El Paso","url":"https://siscto.si/onsite-power/meta-el-paso-gas/","serves":"A Meta data center in El Paso, Texas","power_map_site":null,"fuel":"gas","tech":"Gas plant","mw":366,"mw_text":"366 MW","status":"proposed","status_date":"2026-07-09","connection":"A plant planned for one data center","filing":"Planned; no permit named in the source read","city":"El Paso","state":"TX","sources":[{"publisher":"The Texas Tribune and Floodlight","title":"Planned Texas data centers could emit more greenhouse gases than many countries","url":"https://www.texastribune.org/2026/07/09/texas-data-centers-ai-power-plants-pollution-state-permits/","date":"2026-07-09","read":"2026-11-23"}]},{"slug":"susquehanna-amazon","name":"Susquehanna nuclear plant, Amazon agreement","url":"https://siscto.si/onsite-power/susquehanna-amazon/","serves":"Amazon's data center campus beside the Susquehanna plant, Pennsylvania","power_map_site":"https://siscto.si/power-map/aws-berwick/","fuel":"nuclear","tech":"Existing nuclear plant; power purchase agreement","mw":1920,"mw_text":"1,920 MW under the agreement","status":"running","status_date":"2025-06-11","connection":"An existing or restarting nuclear plant under an agreement","filing":"Talen Energy's announcement of June 11, 2025: a power purchase agreement through 2042","city":"Salem Township","state":"PA","sources":[{"publisher":"Talen Energy","title":"Talen Energy Expands Nuclear Energy Relationship with Amazon","url":"https://www.globenewswire.com/news-release/2025/06/11/3097385/0/en/Talen-Energy-Expands-Nuclear-Energy-Relationship-with-Amazon.html","date":"2025-06-11","read":"2026-11-23"}]},{"slug":"crane-microsoft","name":"Crane Clean Energy Center, Microsoft agreement","url":"https://siscto.si/onsite-power/crane-microsoft/","serves":"Microsoft, under a power purchase agreement (no single data center named)","power_map_site":null,"fuel":"nuclear","tech":"Restart of the former Three Mile Island Unit 1","mw":835,"mw_text":"835 MW","status":"building","status_date":"2026-11-23","connection":"An existing or restarting nuclear plant under an agreement","filing":"Constellation's plant page: restart expected in 2027, subject to Nuclear Regulatory Commission approval","city":"Middletown","state":"PA","sources":[{"publisher":"Constellation","title":"Crane Clean Energy Center","url":"https://www.constellationenergy.com/about/locations/crane-clean-energy-center.html","date":"2026-11-23","read":"2026-11-23"}]},{"slug":"clinton-meta","name":"Clinton Clean Energy Center, Meta agreement","url":"https://siscto.si/onsite-power/clinton-meta/","serves":"Meta, under a power purchase agreement (no single data center named)","power_map_site":null,"fuel":"nuclear","tech":"Existing nuclear plant; 20 year power purchase agreement","mw":1121,"mw_text":"1,121 MW under the agreement","status":"running","status_date":"2025-06-03","connection":"An existing or restarting nuclear plant under an agreement","filing":"Constellation's announcement of June 3, 2025: a 20 year agreement starting June 2027","city":"Clinton","state":"IL","sources":[{"publisher":"Constellation","title":"Constellation, Meta Sign 20-Year Deal for Clean, Reliable Nuclear Energy in Illinois","url":"https://www.constellationenergy.com/newsroom/2025/constellation-meta-sign-20-year-deal-for-clean-reliable-nuclear-energy-in-illinois.html","date":"2025-06-03","read":"2026-11-23"}]}],"url":"https://siscto.si/onsite-power/"}